CRSC is an 11km overland conveyor system which will transport coal from Peak Downs Mine to the Coal Handling Preparation Plant (CHPP) at the nearby Caval Ridge Mine. Black Cat Civil supplied plant, operators and supervisions for the earthworks component of the project. The project construction and earthworks involve approximately 250,000 cubic metres of bulk earthworks to form the conveyor corridor and adjacent access track, a reinforced earth wall consisting of approximately 5,000 cubic metres of structural concrete, and requires more than 700,000 tonnes of quarry product associated with heavy vehicle pavements and bridge abutment armour rock.