The project was carried out in remote area with a high level of interaction with other contractors, in addition to working in with required site shutdowns and finding ways to be flexible with our works program so defence can continue operations.
Works included clearing and grubbing, non destructive excavation, general earthworks, detail excavation, building foundation pads, recreational facilities installation of stormwater systems and structures, construction of varying pavement profiles, kerb works, bitumen sealing, line marking, construction of specialised evaporation ponds and grounds rehabilitation. Works were carried out within security controlled and restricted areas, and occasionally adjacent to vibration sensitive defence operations. After construction Black Cat Civil performed demolition of redundant structures and areas, and removal of services (sewer, water, power, electrical, comms).